ANNI Engineering Achieved Safe Use of Orthopans And X-Rays in The Military Medical Center of The Army of Montenegro in Podgorica

ANNI Engineering has successfully carried out works on the adaptation of the premises for the safe use of orthopans and X-rays in the building of the Military Medical Center of the Army of Montenegro in Podgorica. As part of the renovation, a Knauf “safeboard” panel system, lead doors and antistatic floors were installed. X-ray examination […]
Successfully Completed Adaptation of The M:TEL Branch Office in Ul. Slobode in Podgorica

We’re proud of another cooperation with M:TEL Montenegro, and that our cooperation has become more intensive and successful over time. M:TEL is opening a new branch office in ul. Slobode in Podgorica, and ANNI Engineering has been selected as the contractor for this adaptation. The planned and completed works are: preparation works plumbing and sewerage […]
Works on MTEL Backoffice and Warehouses in Bijelo Polje, Berane and Pljevlja Successfully Completed

Stable and successful cooperation with M:TEL Montenegro continues. ANNI Engineering is engaged in the adaptation of the backoffice and warehouse space in Pljevlja, Berane and Bijelo Polje. The following works have been completed: Electrical energy works (dismantling works of sockets and existing lighting, installation of lighting, installation of sockets, installation of earthing) Architectural and construction […]
ANNI as The Contractor for The Construction of The Interaction Pavilion on The Campus of The University of Montenegro

On the occasion of marking the Day of the Faculty of Architecture of the University of Montenegro and three decades since the adoption of the Declaration on Environmental Montenegro, September 23, 2021, on the campus of the University of Montenegro, the Interaction Pavilion was officially opened. The pavilion was designed by third year students of […]
Floor Laying Works for Addiko Bank

In addition to being their client since their very beginning, in 2021 we are continuing our cooperation with Addiko Bank as contractors. We have done the following works for the Bank: Dismantling of the existing glass partition with glass doors and taking it to the city landfill • Filling in places where the slit remains […]
Suspended ceiling works in the offices of “Plantaze 13. jul “

Our cooperation with “Plantaze 13. Jul ” continues this year as well. This time, ANNI Engineering is engaged in the work of making a suspended ceilings in their offices. Our task was as follows: Removal of the existing suspended ceiling from perforated profiles with substructure and removal to the landfill Delivery and installation of a […]
Adaptation of the M:TEL branch office in Cetinje

ANNI Engineering and M:TEL singed a contract for construction and craft works on the basis of which the adaptation of the new space in Cetinje was carried out, which included architectural and construction works, weak and strong current works. Construction of partition walls Disassembly of glass partition with door Procurement and installation of doors for […]
Ericsson Hires ANNI for Wall Painting and Deep Cleaning

The partnership with Ericsson in Montenegro dates back to 2016, when the General Services Agreement was signed. This time we are engaged in wall painting and deep cleaning of MTKC and TKC Podgorica facilities. The works included: Painting works: Scraping the damaged surfaces of plaster walls, procuring materials and smoothing them by applying the appropriate […]
Successfully Completed Painting and Deep Cleaning Works in the HQ Building of Crnogorski Telekom

Crnogorski Telekom is a long-term partner of ANNI Engineering and together we had the opportunity to cooperate on numerous projects. This time, we are engaged in painting and deep cleaning of the interior of all floors in the HQ building of Crnogorski Telekom in Moskovska Street in Podgorica. The works included the following: Procurement of […]
The MTEL branch office in Bijelo Polje has been renovated

ANNI and MTEL continue to cooperate on another project: the adaptation of a new Mtel branch in Bijelo Polje. From the business premise that originally had a different purpose, we managed to adapt the branch office in accordance with MTEL’s requirements and standards. The works included construction and craft works (demolition works, waterproofing and cement […]
Replacement of roof panels for Crnogorski Telekom

Successfully completed the replacement of roof lexan panels at the Crnogorski Telekom facility in Moskovska Street in Podgorica. We performed the following works: Dismantling of LEXAN polycarbonate multi-wall panels Procurement, transport and installation of new lexan polycarbonate multi-wall panels Procurement, transport and installation of new aluminum “U” moldings
Adaptation of the Branch Office in Berane – Done by ANNI Engineering

Despite a very difficult year, under difficult conditions due to the pandemic, we contracted and implemented the adaptation of the branch office in Berane for Mtel doo. We performed construction and craft works on the adaptation of the shop at the address Mojsija Zečevića number 3 in Berane. We have completed installation works, toilets installation, […]