Chief Engineer from ANNI Engineering Hired as a Local Expert on the Project „Improving Energy Efficiency in Public Buildings – Greening Public Infrastructure in Montenegro“

(“Promotion of Energy Efficiency in Public Buildings – Greening Public Infrastructure in Montenegro”) The Chief Engineer from ANNI Engineering has been hired as a local expert consultant on the project „Improving energy efficiency in public buildings – Greening public infrastructure in Montenegro“). The aim of the project is to improve energy efficiency in selected public […]
Suspended ceiling works in the offices of “Plantaze 13. jul “

Our cooperation with “Plantaze 13. Jul ” continues this year as well. This time, ANNI Engineering is engaged in the work of making a suspended ceilings in their offices. Our task was as follows: Removal of the existing suspended ceiling from perforated profiles with substructure and removal to the landfill Delivery and installation of a […]
Adaptation of the M:TEL branch office in Cetinje

ANNI Engineering and M:TEL singed a contract for construction and craft works on the basis of which the adaptation of the new space in Cetinje was carried out, which included architectural and construction works, weak and strong current works. Construction of partition walls Disassembly of glass partition with door Procurement and installation of doors for […]
Ericsson Hires ANNI for Wall Painting and Deep Cleaning

The partnership with Ericsson in Montenegro dates back to 2016, when the General Services Agreement was signed. This time we are engaged in wall painting and deep cleaning of MTKC and TKC Podgorica facilities. The works included: Painting works: Scraping the damaged surfaces of plaster walls, procuring materials and smoothing them by applying the appropriate […]
Successfully Completed Painting and Deep Cleaning Works in the HQ Building of Crnogorski Telekom

Crnogorski Telekom is a long-term partner of ANNI Engineering and together we had the opportunity to cooperate on numerous projects. This time, we are engaged in painting and deep cleaning of the interior of all floors in the HQ building of Crnogorski Telekom in Moskovska Street in Podgorica. The works included the following: Procurement of […]
ANNI and the Tenants’ Assemblies Are Organizing Their First Humanitarian Action

ANNI and a number of our clients – the assembly of tenants, are organizing a humanitarian action to raise funds for the treatment of the boy Damjan Ranitović from Bar. Donations are paid into the boy’s mother’s bank account to help raise funds for treatment. The tenants ‘assemblies that took part in the action received […]
Adaptation of the Branch Office in Berane – Done by ANNI Engineering

Despite a very difficult year, under difficult conditions due to the pandemic, we contracted and implemented the adaptation of the branch office in Berane for Mtel doo. We performed construction and craft works on the adaptation of the shop at the address Mojsija Zečevića number 3 in Berane. We have completed installation works, toilets installation, […]
ANNI is Engaged in the Project of Revitalization of Facades at 6 “Lukoil” gas stations

Based on the Contract under the “Tender for the revitalization of facades and sheet metal cladding at 6 gas stations” LUKOIL Montenegro “at the following locations: Gas station Bijelo Polje Gas station Kolasin Gas station Konik Gas station Tuzi Gas station Vladimir Gas station Sukobin The work performed was specific due to the application of […]
Adaptation of Toilets in the Building of the Radio and Television of Montenegro

Based on the Contract under the “Tender for the adaptation of toilets in the RTCG building”, ANNI Engineering performs the work of adaptation of all toilets in the building of the Radio Television of Montenegro. The work performed included the replacement of ceramics, sanitary ware and locksmithing.
Adaptation of the Dental Clinic in Cetinje was performed

ANNI Engineering concludes a contract with the owner Rajko Đurišić for the adaptation and equipping of the dental clinic office “Đurišić Dental Center” in Cetinje. The works were performed in an orderly and timely manner, in agreement with the investor.
ANNI Receives a License as a Designer and Contractor

On October 17, 2018, the Ministry of Sustainable Development and Tourism, Licensing Directorate, issued a license to ANNI Engineering for the design and execution of works. Certified engineer of ANNI Engineering has an auditor’s license to perform technical documentation audits and professional supervision over the construction of the facility, as well as a licensed engineer’s […]
Construction and Fit-out Works of Business Premises for Physiotherapy Practice

We have been selected as contractors for the construction, adaptation and equipping of business premises in “Blok IX“ intended for physiotherapy practice. ANNI and its engineers met with investors before the works were carried out to ensure that their idea was put into practice. We wish our partners successful work in the new facility.